Galería del Paseo

Calle Santa Rosa
Tania Bedriñana
Title: Calle Santa Rosa
Technique: Restos de muro sobre lino
Year: 2018
Dimensions: 160 x 180 cm
Price: US$ 5000 Dólares americanos
Contact us
CAPTCHA
(*) Required fields

eZ debug

Timing: Feb 09 2026 13:44:02
Script start
Error: Feb 09 2026 13:44:02
The parent ID 40710 of element with ID 40799 does not point to the last entry which had ID 53827, incorrect path would be calculated, aborting
Error: Feb 09 2026 13:44:02
eZContentObjectTreeNode::pathWithNames() failed to fetch path of node 8861, falling back to generated url entries. Run updateniceurls.php to fix the problem.
Timing: Feb 09 2026 13:44:02
Module start 'content'
Timing: Feb 09 2026 13:44:02
Module end 'content'
Timing: Feb 09 2026 13:44:02
Script end

Main resources:

Total runtime0.0488 sec
Peak memory usage3,072.0000 KB
Database Queries3

Timing points:

CheckpointStart (sec)Duration (sec)Memory at start (KB)Memory used (KB)
Script start 0.00000.0181 920.6641953.2344
Module start 'content' 0.01820.0103 1,873.8984484.7188
Module end 'content' 0.02850.0202 2,358.6172490.9375
Script end 0.0487  2,849.5547 

Time accumulators:

 Accumulator Duration (sec) Duration (%) Count Average (sec)
Ini load
Load cache0.00306.1071140.0002
Mysql Total
Database connection0.00163.244810.0016
Mysqli_queries0.006713.687530.0022
Looping result0.00010.157830.0000
TS translator
TS init0.00163.238530.0005
TS cache load0.00122.490330.0004
TS context load0.00112.194730.0004
Template Total0.018838.610.0188
Template load0.00112.232310.0011
Template processing0.017736.312010.0177
Override
Cache load0.00061.276910.0006
General
dbfile0.009018.4258180.0005
Note: percentages do not add up to 100% because some accumulators overlap

Time used to render debug report: 0.0003 secs